Blog Img

Houston’s newest wastewater treatment facility was racing toward a commissioning deadline when crews discovered widespread moisture intrusion inside three miles of below‑grade chlorine‑dioxide distribution piping. Left unchecked, residual water threatened to corrode stainless linings, dilute disinfection potency, and stall the plant’s start‑up schedule. The prime contractor tapped John C. Digertt Inc. to engineer a rapid, non‑invasive remediation solution that could be mobilized immediately and completed without trenching or pipe replacement.

September 23, 2026
Read more